SKA is providing building envelope consulting services for the Roper St. Francis Berkeley Hospital Addition that is being constructed in Summerville, SC. The purpose of SKA services will be to perform building envelope commissioning services prior to and during construction in order to aid in preventing moisture intrusion into the building. The project includes construction […]
SKA is providing building envelope consulting services for the UNC Health Blue Ridge Hospital Expansion that is being constructed in Morganton, NC. The purpose of SKA services will be to perform building envelope commissioning services prior to and during construction in order to aid in preventing moisture intrusion into the building. The project includes construction […]
SKA performed a third party review of the building envelope design at multiple stages including at SD, DD, 50%CD and 95% CD. Throughout the process SKA provided comments to the Architectural team. Several work sessions were conducted to review SKA’s comments with the team and to receive feedback from the designers related to their intent. […]
SKA performed a third party review of the building envelope design at multiple stages including at SD, DD, 50% CD and 95% CD. Throughout the process SKA provided SKA provided MEP and building envelope commissioning services for $28M Macon Pond Medical Office Building in Raleigh, NC. The new building is a four story steel framed […]
SKA provided multi-disciplinary services including a structural peer review, design, building envelope commissioning and quality assurance testing during construction. As the structural engineer of record on this four-story, 70,600 sf addition, our design incorporated three elevated structural steel framed floors of occupiable space in addition to the floor slab on grade. The MOB1 addition is […]
SKA conducted third party design reviews of the Building Envelope Systems to include below grade waterproofing, exterior façade, plaza waterproofing and roofing for Cone Health on the North Tower, Central Energy Plant, and Wesley Long Hospital (264,000 sf and $200M total). Upon completion of the reviews, SKA prepared reports outlining our comments and participated in […]