UNC Greensboro Soccer Stadium

SKA has renovated many stadiums in North Carolina and worked with a team specializing in field repairs to renovate UNCG’s soccer stadium complex in short time for their Conference Championships held in 2015. The repairs addressed the structural, electrical and waterproofing concerns that were identified during a cursory condition assessment at the UNC Greensboro soccer […]

WFU McCreary Indoor Football Practice Center

The latest trend in athletics for higher education institutions is the use of indoor practice facilities, which allow athletes to maintain training schedules regardless of inclement weather. Named in honor of Bob McCreary, a 1961 Wake Forest University graduate and prominent donor, this is the school’s first indoor practice facility. Designed to serve all athletic […]

NC State University Doak Stadium

SKA joined with a contractor to provide structural engineering for the NCSU Doak Baseball Stadium renovations and additions. As part of the renovation and enhancement project, a new 12,400 sf Batting and Pitching Lab is being added along with a new state of the art player lounge, locker room and player development center. Directly above […]

Nissan Stadium

SKA was contracted to assess the condition of the Nissan Stadium and develop repair documents for the waterproofing of the upper deck and upper concourse. Engineers identified water infiltration issues stemming from incorrect original installation of expansion joints (EJs), aged sealant, aged EJ’s and sub-roofs not being water tight, open drainage piping in mechanical chases, no […]

Liberty University Basketball Arena Peer Review

SKA was retained by Odell Associates Inc. to provide building envelope design peer review and commissioning services for the new Liberty University Basketball Arena and building envelope design peer review for the Football Operations Center. The services included review of construction design of the building envelope for both buildings, which included curtainwall and storefront windows, […]

UNC Charlotte Jerry Richardson Football Stadium

SKA provided structural engineering design for this two-story, 46,150 sf field house; retaining wall and storage building required for relocation of fields 8 and 9; a 70 foot pre-engineered prefabricated steel pedestrian bridge added to cross over a wetland to tie two practice fields together; a 6,636 sf press box, complete with media seating; television […]