solution: Parking Deck Construction
Working with a design build team, SKA served as structural engineer for SKA will provide vertical gravity and lateral supports for the new helipad and elevated walkway. The helipad and walkway horizontal framing were designed by FEC and design loads were provided to SKA. To support the elevated walkway near the new elevator tower, a […]
Following previous assessment and repairs, SKA is providing additional repairs for the parking deck which include: installing new sealants on the top exposed level of the deck; cleaning existing drains; regional application of deck coatings in areas of ponding; repairing of expansion joints on the top level; and installing new drains in six selected locations […]
SKA was the prime designer and Engineer of Record for the new Novant Health Heart and Vascular Institute-Cancer Institute (HVI-CI) parking deck in Midtown Charlotte. The new eight-story parking deck consists of approximately 1,004 spaces and 391,000 sf, and consists of cast-in-place, post-tensioned construction. The design included a deep foundation system of pile caps, grade […]
SKA performed condition assessments and subsequent repairs on the Sherrill Center and Ridges Parking Decks at UNCA. During the assessments, structural and maintenance deficiencies were identified and reported. SKA prepared a report of the findings including a prioritization of repairs and opinion of cost estimates to extend the useful service life of these parking decks. […]
SKA provided structural engineering services for the HPU Parking Deck completed before classes began in Fall 2023. This is the first parking deck on High Point University’s campus. This deck is a 5-level, 1,100 car parking deck constructed utilizing precast concrete. The exterior wall panels were cast with thin brick that is integral with the […]
SKA provided structural design for new six-level, 660 space, precast concrete parking deck to serve the new county courthouse to be constructed simultaneously nearby. The design reflects the scale and character of the surrounding office buildings and maintains the continuity of the Church Street office buildings while providing convenient parking to also support vibrant downtown […]
Novant Health engaged SKA’s services to provide condition assessments of eight parking decks. The project scope involved review of available construction documents, maintenance reports, and repair documents provided by Novant Health. SKA conducted visual assessments of the facilities in order to identify distress or damage that would be a significant compromise in the structural performance […]
SKA was the structural engineer of record on a new 8-level precast parking structure for Atrium Health in Pineville, NC. SKA provided foundation design, coordination of the precast superstructure, and construction contract administration services. The design included a deep foundation system of pile caps and recycled steel pipe piles. The Integrated Project Delivery method was […]